How long is the duration that applies to normal post-contingency voltage limits?

Prepare for the PJM Transmission Test. Study with flashcards and multiple choice questions, each question includes hints and explanations. Boost your readiness!

Multiple Choice

How long is the duration that applies to normal post-contingency voltage limits?

Explanation:
The correct response is based on the nature of post-contingency voltage limits in transmission systems. Typically, post-contingency voltage limits are designed to be assessed immediately following a contingency event, such as a fault or an outage. Therefore, the term "Immediate" signifies the timeframe within which operators are expected to respond and address any voltage issues that arise after a disturbance to the system. In many regulatory frameworks and utility operation standards, the post-contingency conditions are expected to be managed as quickly as possible to maintain system reliability and to avoid further complications or cascading failures. Thus, the concept of having a specific duration such as 15 or 30 minutes doesn't typically apply to the immediate response needed for voltage limits. Instead, the limits are meant to be monitored continuously after a contingency has occurred, reinforcing the understanding that their assessment is critical and requires prompt attention right after the event. This context clarifies why "N/A" is the chosen answer, as it reflects that there is no applicable duration beyond the immediate assessment requirements for post-contingency voltage limits.

The correct response is based on the nature of post-contingency voltage limits in transmission systems. Typically, post-contingency voltage limits are designed to be assessed immediately following a contingency event, such as a fault or an outage. Therefore, the term "Immediate" signifies the timeframe within which operators are expected to respond and address any voltage issues that arise after a disturbance to the system.

In many regulatory frameworks and utility operation standards, the post-contingency conditions are expected to be managed as quickly as possible to maintain system reliability and to avoid further complications or cascading failures. Thus, the concept of having a specific duration such as 15 or 30 minutes doesn't typically apply to the immediate response needed for voltage limits. Instead, the limits are meant to be monitored continuously after a contingency has occurred, reinforcing the understanding that their assessment is critical and requires prompt attention right after the event.

This context clarifies why "N/A" is the chosen answer, as it reflects that there is no applicable duration beyond the immediate assessment requirements for post-contingency voltage limits.